Vision and mission
Why Shailka Systems exists, and what we hold ourselves to.
A company is easier to finance when its purpose is clear and its promises are specific. These are ours.
Our vision
An India that grows its food with fertiliser made from its own water, air and renewable power.
Today the ammonia behind India's fertiliser is made from natural gas, much of it imported. We see a country where that molecule is produced at home, without fossil fuel, at a price farmers and the exchequer can rely on for decades.
Our mission
To develop, finance and operate green ammonia production in India at industrial scale.
We will do it at a cost that lets fertiliser producers replace imported fossil-based ammonia, and to a standard that long-term lenders can underwrite.
Build at the scale that matters
A first facility of about 0.55 million tonnes of green ammonia a year: large enough to move a fertiliser supply chain, not a demonstration.
Make it bankable
Proven technology, guaranteed performance, contracted power and offtake, and an evidence base open to independent diligence.
Operate without harm
Design and run hydrogen and ammonia systems so that people, neighbours and the environment are protected at every stage.
Keep the value in India
Indian water, air and renewable power; Indian manufacturing where it is competitive; skilled jobs where the plant is built.
The long-term ambition
From a first plant to one of the world's largest green hydrogen and ammonia hubs.
Our first project is sized to be financed and built. What we are working towards is far larger: renewable power harvested at sea by offshore wind and floating solar, delivered to a hydrogen and ammonia complex on the shore, with ships loading at its own jetty. In India first, and wherever sun, wind and coastline come together after that.
- Step 1 · Prove
The first plant
100,000 tonnes of green hydrogen a year, converted to about 0.55 million tonnes of green ammonia. This is the current design basis and the project we are developing today.
- Step 2 · Expand
A coastal hub
More production trains at a port site with our own solar and wind, supplying hydrogen to industry and mobility alongside ammonia for fertiliser and export.
- Step 3 · Lead
Powered from the sea
Gigawatts of offshore wind and floating solar feeding shoreline production at a scale that would rank among the largest green hydrogen and ammonia projects in the world.
The benchmark
The largest project under construction today is NEOM Green Hydrogen in Saudi Arabia: about 4 GW of solar and wind, designed for up to 600 tonnes of hydrogen a day and 1.2 million tonnes of green ammonia a year. We intend to build at that scale and beyond.
What this is, and is not
This is our ambition, not a commitment. No offshore site, resource rights or later-phase capacity has been secured or studied to feasibility level. Each step proceeds only when the one before it is financed and performing.
Our values
How we decide when the answer is not obvious.
Evidence before assertion
We state what is established, what is assumed and what is still open. An estimate is always labelled as an estimate.
Safety is not negotiable
No schedule, cost or commercial pressure justifies a shortcut on process safety. Anyone can stop work.
Stewardship of shared resources
Water, land and grid capacity are shared with communities. We take only what is lawfully allotted and sustainably available.
Integrity in every dealing
No bribes, no facilitation payments, no undisclosed interests. Suppliers and partners are chosen by documented, competitive process.
Partnership for the long term
A plant operates for decades. We structure agreements so that lenders, offtakers, suppliers and neighbours all remain better off for having dealt with us.
Discipline with capital
Other people's money is spent gate by gate, against evidenced milestones, and accounted for in full.
What success looks like
The national goals our work serves.
We measure our purpose against targets India has already set for itself.
See how the vision becomes a plant.
The design basis, technology choices and development roadmap are set out in full.