Governance and standards
Built to international standards from the first drawing.
Lenders finance projects that can be audited. We are designing the facility and the organisation around recognised standards so certification is a result of how we work, not a later exercise.
Standards framework
The standards the project is being developed against.
The table shows each framework and where we stand on it today.
| Framework | Scope | How it applies | Status |
|---|---|---|---|
| ISO 9001 | Quality management | Document control, supplier qualification and design review procedures for the project company. | Certification planned |
| ISO 14001 | Environmental management | Environmental aspects register, water and emissions management, compliance obligations. | Certification planned |
| ISO 45001 | Occupational health and safety | Hazard identification, contractor safety management, emergency preparedness. | Certification planned |
| ISO 22734 | Hydrogen generators using water electrolysis | Procurement requirement for electrolyser packages. | Procurement requirement |
| Green Hydrogen Certification Scheme of India | Product certification | Renewable power sourcing and emissions accounting at or below 2.0 kg CO₂e per kg H₂. | Design requirement |
| IFC Performance Standards and Equator Principles | Environmental and social risk | Framework for the environmental and social impact assessment and lender due diligence. | Design requirement |
| Indian statutory codes | Process safety and permitting | Environmental clearance, pressure vessel and hazardous chemical rules, factory and pollution control consents. | At site stage |
Current certification status. Shailka Systems is at the development stage and does not yet hold ISO management system certifications. Management systems will be implemented in the project company and certified by an accredited body ahead of construction and operation. Certificates will be published on this page when issued.
Health, safety and environment
Hydrogen and ammonia demand process safety by design.
Process safety
Hazard and operability studies, quantitative risk assessment and layered protection are built into each engineering stage. Ammonia storage, boil-off handling and loading are designed with separation distances and emergency isolation from the outset.
Water stewardship
A site qualifies only with a legal, reliable water source that does not compete with community supply. Water demand, treatment and discharge are assessed in the site screen before any commitment.
Carbon integrity
Emissions are accounted across the full boundary: power generation, transmission losses, water treatment, electrolysis, synthesis and storage. Claims are made only against a named certification scheme.
Corporate governance
Principles we hold ourselves to.
A development company earns trust by how it handles information and money before the project exists.
Evidence-based disclosure
Every external figure is traceable to a dated source or a stated assumption. Estimates are labelled as estimates.
Stage-gated spending
Development capital is released gate by gate against evidenced milestones, not ahead of them.
Ring-fenced project vehicle
Project assets, permits and contracts are intended to sit in a dedicated company with independent audit.
Integrity in dealings
Zero tolerance for bribery and facilitation payments. Suppliers are selected by competitive, documented process.
Community and land
Land is acquired only through lawful allotment or willing sale, with stakeholder engagement to IFC standards.
Independent review
Technical, legal and financial advisers and the lenders' independent engineer review the project before financial close.
Questions on standards or diligence?
We respond to lender, auditor and adviser enquiries directly.